Crew members maneuver a rebar cage as they ready it to be lowered into a foundation shaft for the East Tower of the Portland-Milwaukie Light Rail Bridge. Each tower has six foundation shafts that have been drilled into the floor of the Willamette River. Each shaft has two rebar cages inserted into it before concrete is poured. Licensed for all uses by TriMet.